Floating Production Offloading (FPO) Quick Response Well Spill Barge (97525593) Products
Name Floating Production Offloading (FPO) Quick Response Well Spill Barge
Code 97525593
Type Standard
Brand Unknown
Category Marine & Subsea Equipment
subcategory Boats Barges & Ships
Price $10,500,000.00
Unit Each (Each)
In Stock Yes
TypeNew
Short DescriptionFloating Production Offloading (FPO) Quick Response Well Spill Barge

Floating Production Offloading (FPO) Quick Response Well Spill Barge

Arctic exploration for gas & oil project was canceled 3 years ago. Barge equipment is brand new (never used)

Original price paid in 2010 = US$220,000 million

This Barge was designed to contain and recover uncontrolled oil and gas subsea well leaks by utilizing a barge carrying oil and gas recovery processing equipment.

Arctic exploration for gas & oil project was canceled 3 years ago.

Barge equipment is brand new (never used)

Specs:

  • Length Overall : 316 ft 6 in
  • Width (Beam) : 104 ft 9 in
  • Depth: 20 ft
  • Load Line: 15 ft 6 in
  • LDT: 5,567.62 tons
  • ITC Gross: 8,008 ITC Net: 2,402
  • Classification : ABS (Expired, needs DD for reactivating the class - appx cost of DD is USD 350,000 a local DD present and available)
  • Last DD: Nov-Dec 2014 ( Hull Maintenance)
  • Capability: 25000 BBL Per Day

Floating Production Offloading (FPO) Quick Response Well Spill Barge

Brage Class: A1 Floating Offshore Installation (FOI), Ice strengthening, Chukchi and Beaufort Seas Coastwise.

Mooring System: Eight point catenary spread mooring system with sheaves submerged below ice & ACE winches

Cranes: Port side: Sparrows EC1000 (160,600lb capacity), Starboard: Sparrows EC65 (22,000lb capacity)

High-Pressure Choke Manifold: High-pressure choke manifold provides well intervention capability via a capping stack. Choke manifold can control flow of hydrocarbons directly from the well to the process and separate water, gas and oil. Gas can be flare. Primarily designed for 25,000 bbl/day, 10,000psi capability.

Processing: 3 phase process separates water from gas and oil. Glycol process heaters provide heat to the process and a chemical injection system introduces anti-foam and demulsifying agents to the system.

Flare Boom: Flaring Capacity: 25,000 bpd of light crude oil, Flaring Time: continuous 45 days expected maximum

Water Curtain: 6,000 gpm water curtain to provide areas of safe thermal radiation levels

Testing: The system is the only existing “offset” deployment source control method, enabling vessel separation from source for shelf response. This equipment has been successfully proven in regulator attended exercises in 2013, 2014 & 2015. Water Run Test performed in 2014 successfully confirmed intake from Containment Dome pumps through the process facilities. Commissioning finalized in 2015 enabling the first US offshore Arctic drilling program.

Floating Processing Offloading Unit (FPO): working couple with a tanker to add storage capacity.

Support: The barge has quarters for 72 people (certify), 4.5 MW electric generation, etc.

All the items are AS IS, WHERE IS. Buyer is responsible for shipping and handling.

Floating Production Offloading (FPO) Quick Response Well Spill Barge

Important Buyers Notice: All items are Sold As-Is with No Warranty expressed or implied. Items offered for sale may be damaged, inoperable and/or missing parts. You are strongly urged to carefully review each photo and video as well as personally inspect the item before making a decision to purchase. Free Oilfield Quote is not responsible for any missing or damaged equipment, part, item or accessory and shall not be held liable for any damage prior to or during the removal and/or delivery of the equipment. Any and all agreements contrary to the above disclaimer must be in writing and agreed upon up front and prior to any transaction.

No loadout & yard info available.

Contact us

Please fill out the form above to receive quote from one of our asset managers or call us toll free at 844-475-2060