2013 Taylor Series 60 TI-500 Workover Rig (25827992) Products
Name 2013 Taylor Series 60 TI-500 Workover Rig
Code 25827992
Type Standard
Brand Taylor Industries
Category Rigs
subcategory Workover / Well Service Rigs
Price $715,000.00
Unit Each (Each)
In Stock No
LocationUSA
TypeSold
Short Description*THIS ITEM HAS BEEN SOLD - FOR OTHER OPTIONS PLEASE CALL 844-475-2060 OR CLICK THE ICON BELOW FOR INSTANT CHAT!

2013 Taylor Series 60 TI-500 Workover Rig

Type: Never Used

Condition: Excellent

Location: USA

Year: 2013

2013 Taylor Series 60 TI-500 Workover Rig Specifications

  • Height: 104 feet
  • Rated Capacity: 240,000 lbs
  • Hours: 1,000
  • Notes: Rig can be used as a drilling and workover rig.

2013 Taylor Series 60 TI-500 Workover Rig Description

Power and Mobility: The TI-500 workover rig is a mobile unit that can be easily transported to various well locations. It is typically mounted on a heavy-duty truck chassis or trailer for mobility. The rig is equipped with a powerful diesel engine that provides the necessary horsepower and torque to perform the required tasks.

Mast and Derrick: The rig features a tall mast or derrick structure that provides vertical support and allows for the raising and lowering of various equipment and tools into the wellbore. The mast is typically hydraulically operated and can have a high lifting capacity to handle heavy loads.

Hydraulic System: The TI-500 workover rig incorporates a hydraulic system to power various functions and operations. This system enables the rig to perform tasks such as lifting and lowering the mast, operating the drawworks (used for hoisting and lowering equipment), and controlling other auxiliary equipment.

Workover Control System: The rig is equipped with a workover control system that provides precise control and monitoring of the workover operations. It includes controls for the mast, drawworks, mud pumps (if applicable), and other essential components, ensuring safe and efficient operation.

BOP (Blowout Preventer) Stack: For well control and safety, the TI-500 workover rig is typically equipped with a blowout preventer stack. The BOP stack is a series of valves and control equipment that is used to seal the wellbore in the event of an unexpected flow of oil, gas, or other fluids. It helps prevent blowouts and ensures the safety of personnel and equipment.

Rig Floor and Equipment Layout: The rig floor of the TI-500 workover rig is a designated area where various equipment, such as tongs, slips, elevators, and power swivels, are positioned for easy access and operation. The layout is designed to maximize efficiency and safety during workover operations.

Auxiliary Equipment: The rig may have additional equipment and tools to support specific workover tasks, such as pipe handling systems, cementing units, pressure control equipment, and wireline units. These auxiliary systems enhance the rig's capabilities and allow for a wider range of well intervention operations.

Important Buyers Notice: All items are Sold As-Is with No Warranty expressed or implied. Items offered for sale may be damaged, inoperable and/or missing parts. You are strongly urged to carefully review each photo and video as well as personally inspect the item before making a decision to purchase. Free Oilfield Quote is not responsible for any missing or damaged equipment, part, item or accessory and shall not be held liable for any damage prior to or during the removal and/or delivery of the equipment. Any and all agreements contrary to the above disclaimer must be in writing and agreed upon up front and prior to any transaction.

No loadout & yard info available.

Contact us

Please fill out the form above to receive quote from one of our asset managers or call us toll free at 844-475-2060